BIM Project Execution Planning Guide, Version 3.0
by Computer Integrated Construction Research Program · Pennsylvania State University
Open textbook from Penn State's Computer Integrated Construction program setting out a four-step procedure for defining BIM goals and uses, mapping information exchange processes, and drafting a project execution plan. Includes downloadable templates and process diagrams.
More resources on BIM (Building Information Modeling)
Aussie BIM Guru
Channel by Gavin Crump, a practising architect working as a BIM and computation lead, covering Revit fundamentals, family creation, Dynamo and pyRevit automation, Rhino.Inside workflows and BIM management practice. Structured playlists run from first-day basics to production scripting.
IFC 4.3 Specification Documentation
Official specification documentation for Industry Foundation Classes, the vendor-neutral ISO 16739 data schema underpinning openBIM exchange. Version 4.3 extends coverage to infrastructure — roads, rail, bridges, ports and waterways — with full entity, property and relationship references.
BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers (4th Edition)
Comprehensive reference covering BIM technology, parametric modeling, interoperability, and the business and contractual changes BIM imposes on owners, designers, engineers, contractors, and facility managers. The 2025 fourth edition adds ISO 19650 frameworks, digital twins, and updated project case studies.